Project

Fletcher Academy

Raleigh, NC

Barringer Construction

CM RED is proud to showcase our successful work on the Fletcher Academy Project, a multifaceted development that reflects our quality, precision, and long-lasting concrete solutions. Located in Raleigh, NC, this project highlights our ability to execute diverse scopes of work with superior craftsmanship and coordination.

As part of the Fletcher Academy construction package, our team delivered 5,500 square feet of slab-on-grade (SOG), forming the core structural surface for the facility. In addition to the main structure, CM RED completed a wide range of site concrete elements, including 3,200 square feet of sidewalk, 100 linear feet of retaining walls, and additional features such as curbs, stairs, and dumpster enclosures. Each component was constructed with a focus on precision, durability, and seamless integration with the overall site design.

Throughout every phase—from layout, excavation, formwork to reinforcement, placement, and finishing—our field crews and project management team maintained strict quality control, strong safety practices, and efficient schedule coordination. Working closely with engineers, site supervisors, and other project partners, we ensured every detail aligned with project requirements and long-term performance expectations.

The Fletcher Academy Project reflects CM RED’s dedication to delivering dependable, high-quality concrete work across educational and commercial environments. With projects like Fletcher Academy, CM RED continues to set the benchmark for professionalism, reliability, and excellence in the concrete construction industry.